1599 Columbus Ave

Project

1599 Columbus Ave

Residential: Affordable Multi Family

Boston, MA | 2023

  • 80K GSF
  • 2 Companies

About

Project Owner

Urban Edge

Is the project Net Zero Energy or Net Zero Energy Ready?

Net Zero Ready

Project Size in GSF

80K

Category of height

Mid-Rise

Number of residential units

65

How is the building all-electric for heating?

Air-source Heat Pump, Ground-source Heat Pump

Is the service hot water all-electric?

Not Applicable

On-site renewable energy

0%

Is the owner purchasing off-site renewable energy to offset all electricity consumption?

Yes

The construction cost difference from "conventional" to being net zero "ready" (including incentives) for this building is

>-1% to 1%

Certifications related to Energy / Carbon

LEED

Site EUI Energy Use Intensity is the amount of energy a project uses per square foot over the course of a year. Site EUI = Annual Energy Use (kBtus) / Building(s) Area (ft²) / One Year (yr)

26.0 kBtu/sf/year

Net Site EUI

0.0 kBtu/sf/year

What is the climate zone for this project?

5A Cool Humid

Project Team

Plumbing Engineering
Mechanical Engineering
Electrical Engineering
Architecture
  • Utile

    In Business Since 2023

    1.1M GSF

    10 Projects