Bunker Hill Housing Redevelopment - Building M

Project

Bunker Hill Housing Redevelopment - Building M

Residential: Affordable Multi Family

Boston, MA | 2031

  • 112K GSF
  • 5 Companies
  • 3 Professionals

About

Building M is a part of the redevelopment of the existing BHA Bunker Hill public housing development. The project scope includes the phased demolition of existing 1,100 unit BHA site (42 bldgs.) and the construction of 2,699 mixed income residential units, (15 new bldgs.) 1,010 of which are direct, income-restricted BHA replacement units (at least twenty two percent (22%) of all the residential units shall be income-restricted). The Master Proposed Project, as described, 4 assumes that the remaining one hundred (100) BHA public housing units shall be replaced elsewhere in the Charlestown neighborhood. Project includes retail/civic space, 20% of retail space shall be made available to tenants at 50% of triple net market rate. Project also includes parking and new public open space. The Proposed Master Project will include approximately, 3,287,000 square feet of Gross Floor Area. (according to "Bunker Hill Housing DPIR - CNBA 2020-02-18 .pdf, Master Plan Total: 3,083,761, Parking Total: 205,200, Residential Total: 2,878,561).

Project Owner

Boston Housing Authority

Is the project Net Zero Energy or Net Zero Energy Ready?

Net Zero Ready

Project Size in GSF

112K

Category of height

Mid-Rise

Number of residential units

102

How is the building all-electric for heating?

Variable Refrigerant Flow (VRF)

Is the service hot water all-electric?

No

What is the primary system type for domestic hot water?

Fossil-fuel fired

On-site renewable energy

7%

Is the owner purchasing off-site renewable energy to offset all electricity consumption?

Unknown

Certifications related to Energy / Carbon

PHIUS

Site EUI Energy Use Intensity is the amount of energy a project uses per square foot over the course of a year. Site EUI = Annual Energy Use (kBtus) / Building(s) Area (ft²) / One Year (yr)

22.5 kBtu/sf/year

The EUI is

Modeled

What is the climate zone for this project?

5A Cool Humid

Websites for more information

Project Team

Mechanical Engineering
Energy / Sustainability Consulting
Construction
Architecture
  • Stantec

    In Business Since 1954

    766.2K GSF

    6 Projects

    1 Professional

Subcontractor
  • Chris Kennedy

    CEM, CPHC®, Phius Certified Verifier

    CxA

    1.3M GSF

    17 Projects

    17 Years Experience