65 First Ave

Project

65 First Ave

Laboratory / Tech / Science

Waltham, MA | 2028

  • 233K GSF
  • 2 Companies
  • 3 Professionals

About

Project Owner

King Street Properties

Is the project Net Zero Energy or Net Zero Energy Ready?

Net Zero Ready

Project Size in GSF

233K

Category of height

High-Rise

How is the building all-electric for heating?

Air-source Heat Pump

What other systems are used for heating?

Fossil Fuel (Emergency Backup or Lab/Healthcare Only)

Is the service hot water all-electric?

Yes

What is the primary system type for domestic hot water?

Electric resistance storage

On-site renewable energy

0%

Is the owner purchasing off-site renewable energy to offset all electricity consumption?

No

Certifications related to Energy / Carbon

LEED

Site EUI Energy Use Intensity is the amount of energy a project uses per square foot over the course of a year. Site EUI = Annual Energy Use (kBtus) / Building(s) Area (ft²) / One Year (yr)

101.0 kBtu/sf/year

Net Site EUI

101.0 kBtu/sf/year

The EUI is

Modeled

What is the climate zone for this project?

5A Cool Humid

Project Team

Architecture
  • DiMella Shaffer

    In Business Since 1965

    1.9M GSF

    20 Projects

    1 Professional

  • Lauren Gunther

    CPHC®

    Director of Sustainability

    1.5M GSF

    9 Projects

    20 Years Experience

Sustainability Consulting
  • Samira Ahmadi

    ASHRAE BEMP, CPHC®, LEED AP BD+C, LEED AP Homes, LEED AP ID+C

    Energy and Sustainability

    2.4M GSF

    12 Projects

    14 Years Experience

  • Gabriel Echeverria

    LEED AP BD+C

    Sustainability Consultant

    1.1M GSF

    6 Projects

    5 Years Experience

Energy Engineering
  • Samira Ahmadi

    ASHRAE BEMP, CPHC®, LEED AP BD+C, LEED AP Homes, LEED AP ID+C

    Energy and Sustainability

    2.4M GSF

    12 Projects

    14 Years Experience