W.T. Rich

W.T. Rich

Construction

In Business Since 1968

Full company of W.T. Rich on 50th Anniversary
  • 598.2K GSF
  • 3 Projects

Projects

  • Tobin Montessori Vassal Lane Upper Schools Project

    Education K-12

    Cambridge, MA | 2025

    275K GSF

    Net Zero (Targeting) Designed to be highly efficient and PLANS TO offset ≥100% of the building energy with on-site and/or off-site renewable energy, on a cumulative annual basis, when the project is completed.

  • King Open/Cambridge St Upper Schools & Community Complex

    Education K-12

    Cambridge, MA | 2019

    273K GSF

    Net Zero (Achieving) The project is highly efficient AND ≥100% of the building energy is offset with on-site and/or off-site renewable energy, on a cumulative annual basis. Energy consumption and renewable energy generation must be based on measured data.

  • The Foundry

    Mixed Use

    Cambridge, MA | 2021

    50.2K GSF

    Net Zero Ready Designed to be highly efficient and DOES NOT offset ≥100% of the building energy with on-site and/or off-site renewable energy, on a cumulative annual basis.


Contact

Office Location Natick, MA


About

Building Types

  • Education K-12