Project
Wentworth Institute of Technology - 500 Huntington Ave, Boston
Laboratory / Tech / Science
Boston, MA | 2030
- 660K GSF
- 1 Company
- 2 Professionals
About
The Fallon Company is developing 500 Huntington Ave. The project includes Tower 1, Tower 2, and Building 3 located in Boston, MA. Tower 1 is a nine-floor 260,000 SF lab and office core and shell building. Tower 2 is a fourteen-floor 400,000 SF lab and office core and shell building. Building 3 is a one-floor 5,000 SF retail space. The project will be designed to accommodate a mix of 60% laboratory and 40% office space.
Project Owner
Fallon Companies
Is the project Net Zero Energy or Net Zero Energy Ready?
Net Zero Ready
Project Size in GSF
660K
Category of height
Mid-Rise
How is the building all-electric for heating?
Air-source Heat Pump
What other systems are used for heating?
Fossil Fuel (Emergency Backup or Lab/Healthcare Only)
Is the service hot water all-electric?
No
On-site renewable energy
0%
Is the owner purchasing off-site renewable energy to offset all electricity consumption?
No
Certifications related to Energy / Carbon
LEED
Site EUI Energy Use Intensity is the amount of energy a project uses per square foot over the course of a year. Site EUI = Annual Energy Use (kBtus) / Building(s) Area (ft²) / One Year (yr)
123.0 kBtu/sf/year
Net Site EUI
123.0 kBtu/sf/year
The EUI is
Modeled
Carbon Emissions Intensity (CEI)
6.70kg/CO2e/sf
What is the climate zone for this project?
5A Cool Humid