Project
Hamilton at Mount Everett Senior Apartments
Senior Living
Dorchester, MA | 2026
- 44.4K GSF
- 2 Companies
- 1 Professional
About
"The Hamilton at Mount Everett project will create 36 senior (62+) affordable rental units at 33 Hamilton Street in Dorchester. The existing two-family structure, which is vacant, will be demolished and a four-story "L" shaped building will be newly constructed. The first floor will contain approximately 1,000 square feet of common space including a community room, lobby, management office, meeting room, game alcove, package room bicycle room and two elevators.
The site plan includes 13 parking spaces and 18 bicycle parking spaces. There will be 4 Homeless Set Aside units, 12 units available at or below 30% AMI and 20 units available at or below 60% AMI. All 36 affordable units will be 1-Bedroom."
- City of Boston
Project Owner
Vietnamese American Initiative for Development (VietAID)
Is the project Net Zero Energy or Net Zero Energy Ready?
Net Zero Ready
Project Size in GSF
44.4K
Category of height
Low-Rise
Number of residential units
36
How is the building all-electric for heating?
Air-source Heat Pump
Is the service hot water all-electric?
Yes
What is the primary system type for domestic hot water?
Air-source heat pump
On-site renewable energy
0%
Is the owner purchasing off-site renewable energy to offset all electricity consumption?
Unknown
The construction cost difference from "conventional" to being net zero "ready" (including incentives) for this building is
We didn't calculate the cost premium
Certifications related to Energy / Carbon
ENERGY STAR, PHIUS, ZERH
Site EUI Energy Use Intensity is the amount of energy a project uses per square foot over the course of a year. Site EUI = Annual Energy Use (kBtus) / Building(s) Area (ft²) / One Year (yr)
21.0 kBtu/sf/year
The EUI is
Modeled
What is the climate zone for this project?
5A Cool Humid