Project
East Boston Passive House Project
Residential: Multi-family
Boston, MA | 2025
- 200.8K GSF
About
Is the project Net Zero Energy or Net Zero Energy Ready?
Net Zero Ready
Project Size in GSF
200.8K
Category of height
Mid-Rise
How is the building all-electric for heating?
Air-source Heat Pump
Is the service hot water all-electric?
Yes
On-site renewable energy
6%
Is the owner purchasing off-site renewable energy to offset all electricity consumption?
Yes
Site EUI Energy Use Intensity is the amount of energy a project uses per square foot over the course of a year. Site EUI = Annual Energy Use (kBtus) / Building(s) Area (ft²) / One Year (yr)
21.5 kBtu/sf/year
Net Site EUI
19.9 kBtu/sf/year
The EUI is
Modeled
What is the climate zone for this project?
5A Cool Humid