Nitsch Engineering

Nitsch Engineering

Civil Engineering

In Business Since 1989

Nitsch Engineering employees
  • 1.6M GSF
  • 5 Projects

Projects

  • 380 Stuart Street

    Office

    Boston, MA | 2026

    625K GSF

    Net Zero Ready Designed to be highly efficient and DOES NOT offset ≥100% of the building energy with on-site and/or off-site renewable energy, on a cumulative annual basis.

  • 244-284 A Street Development

    Residential: Multi-family

    Boston, MA | 2023

    392.1K GSF

    Net Zero Ready Designed to be highly efficient and DOES NOT offset ≥100% of the building energy with on-site and/or off-site renewable energy, on a cumulative annual basis.

  • 80 East Berkeley

    Laboratory / Tech / Science

    Boston, MA | 2027

    328K GSF

    Net Zero Ready Designed to be highly efficient and DOES NOT offset ≥100% of the building energy with on-site and/or off-site renewable energy, on a cumulative annual basis.

  • Concord Middle School Project

    Education K-12

    Concord, MA | 1990

    143.5K GSF

    Net Zero (Targeting) Designed to be highly efficient and PLANS TO offset ≥100% of the building energy with on-site and/or off-site renewable energy, on a cumulative annual basis, when the project is completed.

  • David Mindess Elementary School

    Education K-12

    Ashland, MA | 2024

    105K GSF

    Net Zero Ready Designed to be highly efficient and DOES NOT offset ≥100% of the building energy with on-site and/or off-site renewable energy, on a cumulative annual basis.


Contact

Office Location Boston, MA


About

Building Types

  • Education K-12