Dore + Whittier

Dore + Whittier

Architecture

In Business Since 1992

Logo of Dore + Whittier
  • 453.1K GSF
  • 5 Projects

Projects

  • Pine Hill Elementary School

    Education K-12

    Westwood, MA | 2024

    113.1K GSF

    Net Zero (Achieving) The project is highly efficient AND ≥100% of the building energy is offset with on-site and/or off-site renewable energy, on a cumulative annual basis. Energy consumption and renewable energy generation must be based on measured data.

  • Hanlon Elementary School

    Education K-12

    Westwood, MA | 2023

    113K GSF

    Net Zero Ready Designed to be highly efficient and DOES NOT offset ≥100% of the building energy with on-site and/or off-site renewable energy, on a cumulative annual basis.

  • Maria Hastings Elementary School

    Education K-12

    Lexington, MA | 2020

    110K GSF

    Net Zero (Achieving) The project is highly efficient AND ≥100% of the building energy is offset with on-site and/or off-site renewable energy, on a cumulative annual basis. Energy consumption and renewable energy generation must be based on measured data.

  • Fox Hill Elementary School

    Education K-12

    Burlington, MA | 2028

    91K GSF

    Net Zero Ready Designed to be highly efficient and DOES NOT offset ≥100% of the building energy with on-site and/or off-site renewable energy, on a cumulative annual basis.

  • Norfolk Fire Station

    Mixed Use

    Norfolk, MA | 2024

    26K GSF

    Net Zero Ready Designed to be highly efficient and DOES NOT offset ≥100% of the building energy with on-site and/or off-site renewable energy, on a cumulative annual basis.


Contact

Office Locations Newburyport, MA
Burlington, VT


About

Building Types

  • Education K-12
  • Education: Higher Ed