Ai3 Architects

Ai3 Architects

Architecture

In Business Since 2004

Image of project by A3 Architects
  • 703.8K GSF
  • 5 Projects

Projects

  • Watertown High School

    Education K-12

    Watertown, MA | 2026

    197K GSF

    Net Zero (Targeting) Designed to be highly efficient and PLANS TO offset ≥100% of the building energy with on-site and/or off-site renewable energy, on a cumulative annual basis, when the project is completed.

  • Coakley Middle School Building Project

    Education K-12

    Norwood, MA | 2025

    187.8K GSF

    Net Zero (Achieving) The project is highly efficient AND ≥100% of the building energy is offset with on-site and/or off-site renewable energy, on a cumulative annual basis. Energy consumption and renewable energy generation must be based on measured data.

  • Hosmer Elementary School

    Education K-12

    Watertown, MA | 2023

    142.5K GSF

    Net Zero Ready Designed to be highly efficient and DOES NOT offset ≥100% of the building energy with on-site and/or off-site renewable energy, on a cumulative annual basis.

  • J.R. Lowell Elementary

    Education K-12

    Watertown, MA | 2023

    94.1K GSF

    Net Zero Ready Designed to be highly efficient and DOES NOT offset ≥100% of the building energy with on-site and/or off-site renewable energy, on a cumulative annual basis.

  • Cunniff Elementary School

    Education K-12

    Watertown, MA | 2021

    82.4K GSF

    Net Zero Ready Designed to be highly efficient and DOES NOT offset ≥100% of the building energy with on-site and/or off-site renewable energy, on a cumulative annual basis.


Contact

Office Location Framingham, MA


About

Building Types

  • Education K-12