Project
One Milestone at Enterprise Research Campus
Laboratory / Tech / Science
Boston, MA | 2027
- 540K GSF
- 4 Companies
- 12 Professionals
About
One Milestone, a new life science project within the Enterprise Research Campus, is transforming an industrial site into a vibrant mixed-use development. The project supports a sustainable future through the creation of energy-efficient, healthy buildings – including two lab buildings and an office building – and low-carbon construction methods that will be resilient to climate change.
Project Owner
Tishman Speyer / Breakthrough Properties
Is the project Net Zero Energy or Net Zero Energy Ready?
Net Zero (Targeting)
Project Size in GSF
540K
Category of height
High-Rise
How is the building all-electric for heating?
Air-source Heat Pump
What other systems are used for heating?
Exhaust-source Heat Pump
Is the service hot water all-electric?
No
What is the primary system type for domestic hot water?
Fossil-fuel fired
What other systems are used for hot water?
Air-source heat pump
On-site renewable energy
0%
Is the owner purchasing off-site renewable energy to offset all electricity consumption?
Yes
The construction cost difference from "conventional" to being net zero "ready" (including incentives) for this building is
-1% to 1%
Certifications related to Energy / Carbon
LEED
Site EUI Energy Use Intensity is the amount of energy a project uses per square foot over the course of a year. Site EUI = Annual Energy Use (kBtus) / Building(s) Area (ft²) / One Year (yr)
121.0 kBtu/sf/year
Net Site EUI
121.0 kBtu/sf/year
The EUI is
Modeled
Carbon Emissions Intensity (CEI)
6.30kg/CO2e/sf
What is the climate zone for this project?
5A Cool Humid