Project
University of Illinois Electrical and Computer Engineering (ECE) Building
Education: Higher Ed
Urbana, IL | 2014
- 183K GSF
About
"The Electrical and Computer Engineering Building on the University of Illinois at Urbana-Champaign campus is designed to be net-zero energy, or to produce as much energy as it consumes annually. It opened in the fall of 2014, and achieved LEED Platinum certification in 2019. In February 2023, the ECE Building became the university's first zero energy certified facility.
The ECE Building is meant to be a living laboratory, allowing students and faculty members to research its sustainable features. It’s also meant to be a model for net-zero energy design in the Midwest, proving you don’t have to live in a tropical climate to produce more energy than you consume within a building."
Project Owner
University of Illinois
Is the project Net Zero Energy or Net Zero Energy Ready?
Net Zero (Achieving)
Project Size in GSF
183K
Category of height
Mid-Rise
How is the building all-electric for heating?
Air-source Heat Pump, Water-source Heat Pump (e.g. lake-source, ocean-source, wastewater-source)
What other systems are used for heating?
Exhaust-source Heat Pump
Is the service hot water all-electric?
Yes
What is the primary system type for domestic hot water?
Unspecified
On-site renewable energy
11%
Is the owner purchasing off-site renewable energy to offset all electricity consumption?
Yes
Certifications related to Energy / Carbon
ILFI Zero Energy Certification
What is the climate zone for this project?
5A Cool Humid