Project
Semans Griswold Environmental Hall
Education: Higher Ed
Chestertown, MD | 2020
- 10K GSF
- 1 Company
About
"As a national leader in undergraduate environmental and sustainability studies, Washington College in Maryland recently opened this new 10,000 square foot environmental center. It provides faculty offices, teaching, and lab space for the college's growing environmental academic programs. The environmental center was built on a brownfield site that the college had remediated. It is directly on the Chester River, allowing students the ability to immediately collect, observe and process samples associated with their coursework.
CMTA designed A PV array and Energy Storage System (ESS) was designed in a way to increase building energy resiliency by coupling PV and ESS to provide back-up power without using combustibles. The ESS system also supports demand management and peak shaving to generate cost savings for the school. A load shedding approach for the ESS system was incorporated that would extend back-up times for critical lab loads."
Project Owner
Washington College
Is the project Net Zero Energy or Net Zero Energy Ready?
Net Zero (Achieving)
Project Size in GSF
10K
Category of height
Low-Rise
How is the building all-electric for heating?
Ground-source Heat Pump
Is the service hot water all-electric?
Yes
What is the primary system type for domestic hot water?
Electric resistance storage
On-site renewable energy
71%
Is the owner purchasing off-site renewable energy to offset all electricity consumption?
No
Site EUI Energy Use Intensity is the amount of energy a project uses per square foot over the course of a year. Site EUI = Annual Energy Use (kBtus) / Building(s) Area (ft²) / One Year (yr)
36.0 kBtu/sf/year
The EUI is
Measured
What is the climate zone for this project?
4A Mixed Humid