Project
Mission Hill Parcel 25 Phase 3
Residential: Affordable Multi Family
Boston, MA | 2026
- 105.9K GSF
- 1 Company
About
Phase 3, the last phase of the development at Parcel 25, will now be a 94-unit affordable family housing development. Phase 3 was approved by both the City of Boston and State of Massachusetts in 2023 and 2024 respectively. The smaller, less dense development (now a 6-story structure) will also allow for better access by the MBTA to their existing infrastructure on the site. The development will include 15 1-bedrooms, 55 2-bedrooms, and 24 3-bedroom apartments, with many of them fully accessible for persons with disabilities, 33 parking spaces in a surface level garage, and a 2,000 sq ft community room. The Phase 3 project is awaiting availability of federal and state Low Income Housing Tax Credits (LIHTC). MHNHS hopes to close on the project and start construction in late 2026.
Is the project Net Zero Energy or Net Zero Energy Ready?
Net Zero Ready
Project Size in GSF
105.9K
Category of height
Mid-Rise
Number of residential units
94
How is the building all-electric for heating?
Air-source Heat Pump
Is the service hot water all-electric?
No
What is the primary system type for domestic hot water?
Fossil-fuel fired
On-site renewable energy
0%
Is the owner purchasing off-site renewable energy to offset all electricity consumption?
Unknown
The construction cost difference from "conventional" to being net zero "ready" (including incentives) for this building is
We didn't calculate the cost premium
Certifications related to Energy / Carbon
PHIUS
Site EUI Energy Use Intensity is the amount of energy a project uses per square foot over the course of a year. Site EUI = Annual Energy Use (kBtus) / Building(s) Area (ft²) / One Year (yr)
23.2 kBtu/sf/year
Net Site EUI
23.2 kBtu/sf/year
The EUI is
Modeled
What is the climate zone for this project?
5A Cool Humid