Medical Office Building at El Centro
Healthcare
Salem, MA | 2030
- 25.7K GSF
- 2 Companies
- 1 Professional
About
Project Owner
North Shore Community Health Center
Is the project Net Zero Energy or Net Zero Energy Ready?
Net Zero Ready
Project Size in GSF
25.7K
Category of height
Mid-Rise
How is the building all-electric for heating?
Air-source Heat Pump, Variable Refrigerant Flow (VRF)
What other systems are used for heating?
Electric Resistance
Is the service hot water all-electric?
Yes
What is the primary system type for domestic hot water?
Air-source heat pump
On-site renewable energy
0%
Is the owner purchasing off-site renewable energy to offset all electricity consumption?
No
The construction cost difference from "conventional" to being net zero "ready" (including incentives) for this building is
We didn't calculate the cost premium
Certifications related to Energy / Carbon
PHIUS
What is the climate zone for this project?