Medical Office Building at El Centro

Project

Medical Office Building at El Centro

Healthcare

Salem, MA | 2030

  • 25.7K GSF
  • 2 Companies
  • 1 Professional

About

Project Owner

North Shore Community Health Center

Is the project Net Zero Energy or Net Zero Energy Ready?

Net Zero Ready

Project Size in GSF

25.7K

Category of height

Mid-Rise

How is the building all-electric for heating?

Air-source Heat Pump, Variable Refrigerant Flow (VRF)

What other systems are used for heating?

Electric Resistance

Is the service hot water all-electric?

Yes

What is the primary system type for domestic hot water?

Air-source heat pump

On-site renewable energy

0%

Is the owner purchasing off-site renewable energy to offset all electricity consumption?

No

The construction cost difference from "conventional" to being net zero "ready" (including incentives) for this building is

We didn't calculate the cost premium

Certifications related to Energy / Carbon

PHIUS

What is the climate zone for this project?

5A Cool Humid

Project Team

MEP/FP Engineering
Architecture
Energy / Sustainability Consulting
  • Spencer Gorman

    CPHC®, LEED AP BD+C, LEED AP Homes

    CPHC

    818.9K GSF

    11 Projects

    4 Years Experience