About
The new Medford Police Station opened in December 2020. On its roof is a 60 kW solar system, fully owned by the city, which helps power the station. The building itself is highly energy-efficient and uses half the energy that it would consume if it was built to only meet the current energy code. The station uses zero fossil fuels for its heating, cooling, and ventilation systems, and instead, relies on heat pumps and a highly efficient energy recovery ventilation system
Is the project Net Zero Energy or Net Zero Energy Ready?
Net Zero Ready
Project Size in GSF
39.9K
Category of height
Low-Rise
How is the building all-electric for heating?
Air-source Heat Pump
Is the service hot water all-electric?
Yes
What is the primary system type for domestic hot water?
Unspecified
On-site renewable energy
20%
Is the owner purchasing off-site renewable energy to offset all electricity consumption?
Unknown
Site EUI Energy Use Intensity is the amount of energy a project uses per square foot over the course of a year. Site EUI = Annual Energy Use (kBtus) / Building(s) Area (ft²) / One Year (yr)
0.0 kBtu/sf/year
What is the climate zone for this project?
5A Cool Humid