Project
Maple on Franklin
Residential: Affordable Multi Family
Holbrook, MA | 2023
- 61.8K GSF
- 2 Companies
About
Maple on Franklin is designed to Passive House certification standards. The resulting performance produces approximately a 90% reduction in heating and cooling energy usage and up to a 75% reduction in primary energy usage compared to homes built to conventional building codes.
Project Owner
Neighborworks Housing Solutions
Is the project Net Zero Energy or Net Zero Energy Ready?
Net Zero Ready
Project Size in GSF
61.8K
Category of height
Mid-Rise
Number of residential units
72
How is the building all-electric for heating?
Air-source Heat Pump
Is the service hot water all-electric?
No
What is the primary system type for domestic hot water?
Fossil-fuel fired
On-site renewable energy
34%
Is the owner purchasing off-site renewable energy to offset all electricity consumption?
Unknown
Certifications related to Energy / Carbon
PHIUS
Site EUI Energy Use Intensity is the amount of energy a project uses per square foot over the course of a year. Site EUI = Annual Energy Use (kBtus) / Building(s) Area (ft²) / One Year (yr)
20.5 kBtu/sf/year
The EUI is
Modeled
What is the climate zone for this project?
5A Cool Humid