Project
King County Parks Central Maintenance Facility
Manufacturing / Industrial
Renton, WA | 2023
- 50.3K GSF
- 1 Company
About
The Renton Shop targets Net Zero Energy certification through advanced systems including air-to-water heat pumps, hydronic floor heating and cooling, mixed-mode natural ventilation, daylight harvesting, and 1,100 rooftop solar panels. A 50,000 volt-ampere battery system ensures reliable backup power without combustion generators. The facility also incorporates future-ready features like electric vehicle charging stations and provisions for fleet electrification. Stormwater management integrates treatment galleries and a bioswale, enhancing water quality and the site’s natural landscape.
Project Owner
King County
Is the project Net Zero Energy or Net Zero Energy Ready?
Net Zero (Targeting)
Project Size in GSF
50.3K
Category of height
Low-Rise
How is the building all-electric for heating?
Air-source Heat Pump
Is the service hot water all-electric?
Yes
What is the primary system type for domestic hot water?
Unspecified
On-site renewable energy
100%
Is the owner purchasing off-site renewable energy to offset all electricity consumption?
Unknown
Certifications related to Energy / Carbon
Living Building Challenge Petal Certification, ILFI Zero Energy Certification
What is the climate zone for this project?
4C Mixed Marine