About
"CMTA provided the Zero Energy and power resiliency consulting for the Project Design Criteria package for the Joint Government Center Campus (JGCC). The initial charrette was to develop an energy goal for the project and define the cost for zero energy and potential for electrical resilience through battery storage. The energy goal of the project was set at 30 EUI (Energy Use Intensity) and is designed to be 100% electric for an operationally carbon neutral campus. Through CMTA’s workshops with the city and county, the criteria package incorporates a high-performance envelope and HVAC system that will reject heat to the Floridan aquifer. The budget was increased ~5% to incorporate funding to reduce energy consumption and add on-site renewable energy."
Project Owner
Miami-Dade County Government
Is the project Net Zero Energy or Net Zero Energy Ready?
Net Zero Ready
Project Size in GSF
1.1M
Category of height
High-Rise
How is the building all-electric for heating?
Water-source Heat Pump (e.g. lake-source, ocean-source, wastewater-source)
Is the service hot water all-electric?
Yes
What is the primary system type for domestic hot water?
Unspecified
On-site renewable energy
18%
Is the owner purchasing off-site renewable energy to offset all electricity consumption?
Yes
Site EUI Energy Use Intensity is the amount of energy a project uses per square foot over the course of a year. Site EUI = Annual Energy Use (kBtus) / Building(s) Area (ft²) / One Year (yr)
72.0 kBtu/sf/year
The EUI is
Modeled
What is the climate zone for this project?
1A Very Hot Humid