Greenfield Fire Station

Project

Greenfield Fire Station

Public Services

Greenfield, MA | 2024

  • 20.2K GSF
  • 1 Company

About

The design includes two buildings (the main headquarters with a historic firefighting museum and a storage annex). The aesthetic is historically sensitive, complementing the rest of the City’s recent modernization projects.

Is the project Net Zero Energy or Net Zero Energy Ready?

Net Zero Ready

Project Size in GSF

20.2K

Category of height

Low-Rise

How is the building all-electric for heating?

Ground-source Heat Pump

What other systems are used for heating?

District Heating Fossil Fuel (Emergency Backup or Lab/Healthcare Only)

Is the service hot water all-electric?

Not Applicable

What is the primary system type for domestic hot water?

Unspecified

On-site renewable energy

0%

Is the owner purchasing off-site renewable energy to offset all electricity consumption?

Unknown

Site EUI Energy Use Intensity is the amount of energy a project uses per square foot over the course of a year. Site EUI = Annual Energy Use (kBtus) / Building(s) Area (ft²) / One Year (yr)

35.0 kBtu/sf/year

Net Site EUI

35.0 kBtu/sf/year

The EUI is

Modeled

What is the climate zone for this project?

5A Cool Humid

Project Team

Architecture