Project
Foundry at Drydock - Parcel O
Laboratory / Tech / Science
Boston, MA | 2024
- 219K GSF
- 4 Companies
- 2 Professionals
About
The Foundry at Drydock creates a state-of-the-art research and development (R&D) campus, contributing to the emerging neighborhood context and delivering a best-in-class experience for its tenants. A new 219,000 sf life sciences facility (Parcel O) is accompanied by the adaptive reuse of an existing steel structure reimagined as a 9,000 sf amenity building (Parcel P).
Project Owner
Marcus Partners
Is the project Net Zero Energy or Net Zero Energy Ready?
Net Zero Ready
Project Size in GSF
219K
Category of height
Mid-Rise
How is the building all-electric for heating?
Air-source Heat Pump
Is the service hot water all-electric?
No
What is the primary system type for domestic hot water?
Unspecified
On-site renewable energy
0%
Is the owner purchasing off-site renewable energy to offset all electricity consumption?
Unknown
The construction cost difference from "conventional" to being net zero "ready" (including incentives) for this building is
-1% to 1%
Certifications related to Energy / Carbon
LEED
Site EUI Energy Use Intensity is the amount of energy a project uses per square foot over the course of a year. Site EUI = Annual Energy Use (kBtus) / Building(s) Area (ft²) / One Year (yr)
113.0 kBtu/sf/year
Net Site EUI
0.0 kBtu/sf/year
The EUI is
Modeled
What is the climate zone for this project?
5A Cool Humid