Etsy HQ

Project

Etsy HQ

Office

Brooklyn, NY | 2017

  • 198.6K GSF
  • 1 Company

About

The Etsy HQ utilized multiple systems and building materials to reduce embodied carbon and emissions. The project "features wood that was invasive, salvaged, reused, or sourced from responsibly managed forests. Low-flow and flush fixtures help reduce water usage, while a 3,500-gallon rainwater tank supports the building’s extensive interior greenery program. High-efficiency light fixtures and daylight controls contribute to energy savings, and onsite and offsite solar arrays provide 100% of the building’s power from renewable sources."

Project Owner

Etsy

Is the project Net Zero Energy or Net Zero Energy Ready?

Net Zero (Achieving)

Project Size in GSF

198.6K

Category of height

High-Rise

How is the building all-electric for heating?

Air-source Heat Pump

Is the service hot water all-electric?

Yes

What is the primary system type for domestic hot water?

Unspecified

On-site renewable energy

25%

Is the owner purchasing off-site renewable energy to offset all electricity consumption?

Yes

Certifications related to Energy / Carbon

Living Building Challenge Petal Certification

What is the climate zone for this project?

4A Mixed Humid

Websites for more information

Project Team

Architecture
  • Gensler

    In Business Since 1965

    412.8K GSF

    2 Projects

    1 Professional