About
Catherine Houghton Arts Center held two spacious dance studios, a dance school lobby, a painting/drawing studio, a music studio, an outdoor stage, and an amphitheater. The building, part of the White Mountain School's campus, was powered by a geothermal heating system and PV array.
The building was shuttered following the permanent closure of the White Mountain School in 2024.
Is the project Net Zero Energy or Net Zero Energy Ready?
Net Zero (Achieving)
Project Size in GSF
4K
Category of height
Low-Rise
How is the building all-electric for heating?
Ground-source Heat Pump
Is the service hot water all-electric?
Yes
What is the primary system type for domestic hot water?
Electric resistance instantaneous
On-site renewable energy
100%
Is the owner purchasing off-site renewable energy to offset all electricity consumption?
Unknown
What is the climate zone for this project?
6A Cold Humid