About
Wendell Holmes Phase II is a 52-unit development in Beverly, MA, located across the street from Wendell Holmes Phase I. Located near the downtown district of Beverly, the project provides needed housing within a short walking distance of the urban center. The building is 4 stories of Type VA construction over 1 basement story of Type IA. 35 parking spaces are provided in the below-grade garage. At the first floor, a small amenity space is located along Rantoul Street, with work pods, a mail and package area, a fitness gym, and an outdoor courtyard on the north side of the building. The 52 units are divided amongst 21% studios, 39% 1-bedrooms, and 40% 2-bedrooms.
Is the project Net Zero Energy or Net Zero Energy Ready?
Net Zero Ready
Project Size in GSF
64.7K
Category of height
Mid-Rise
Number of residential units
52
How is the building all-electric for heating?
Air-source Heat Pump
Is the service hot water all-electric?
Yes
What is the primary system type for domestic hot water?
Electric resistance storage
On-site renewable energy
10%
Is the owner purchasing off-site renewable energy to offset all electricity consumption?
No
Certifications related to Energy / Carbon
PHIUS
Net Site EUI
23.5 kBtu/sf/year
The EUI is
Modeled
What is the climate zone for this project?
5A Cool Humid