Bard Early College High School

Project

Bard Early College High School

Education K-12

Washington, DC | 2023

  • 115K GSF
  • 1 Company

About

"As part of DC Public School’s Capital Improvement Plan, Bard High School was identified as a facility needing full renovation and modernization. The four-story building was transformed from an open-plan elementary school to a state-of-the-art, 21st century high school facility. The modernization includes a new basketball court, track and sports field, a black box theater, and a media center lounge. During the design phase, CMTA worked extensively with the architect to calculate what wall types would be the most effective solution for the renovation. We analyzed R-values, infiltration rates, constructability, and life cycle costs to select an optimized, energy-efficient envelope."

Project Owner

District of Columbia Public Schools

Is the project Net Zero Energy or Net Zero Energy Ready?

Net Zero (Targeting)

Project Size in GSF

115K

Category of height

Mid-Rise

How is the building all-electric for heating?

Ground-source Heat Pump

Is the service hot water all-electric?

Yes

What is the primary system type for domestic hot water?

Unspecified

On-site renewable energy

1%

Is the owner purchasing off-site renewable energy to offset all electricity consumption?

Unknown

Site EUI Energy Use Intensity is the amount of energy a project uses per square foot over the course of a year. Site EUI = Annual Energy Use (kBtus) / Building(s) Area (ft²) / One Year (yr)

20.0 kBtu/sf/year

The EUI is

Measured

What is the climate zone for this project?

4A Mixed Humid

Websites for more information

Project Team

MEP/FP Engineering
  • CMTA

    In Business Since 1968

    4M GSF

    27 Projects

    3 Professionals

Energy Engineering
  • CMTA

    In Business Since 1968

    4M GSF

    27 Projects

    3 Professionals