About
"As part of DC Public School’s Capital Improvement Plan, Bard High School was identified as a facility needing full renovation and modernization. The four-story building was transformed from an open-plan elementary school to a state-of-the-art, 21st century high school facility. The modernization includes a new basketball court, track and sports field, a black box theater, and a media center lounge. During the design phase, CMTA worked extensively with the architect to calculate what wall types would be the most effective solution for the renovation. We analyzed R-values, infiltration rates, constructability, and life cycle costs to select an optimized, energy-efficient envelope."
Project Owner
District of Columbia Public Schools
Is the project Net Zero Energy or Net Zero Energy Ready?
Net Zero (Targeting)
Project Size in GSF
115K
Category of height
Mid-Rise
How is the building all-electric for heating?
Ground-source Heat Pump
Is the service hot water all-electric?
Yes
What is the primary system type for domestic hot water?
Unspecified
On-site renewable energy
1%
Is the owner purchasing off-site renewable energy to offset all electricity consumption?
Unknown
Site EUI Energy Use Intensity is the amount of energy a project uses per square foot over the course of a year. Site EUI = Annual Energy Use (kBtus) / Building(s) Area (ft²) / One Year (yr)
20.0 kBtu/sf/year
The EUI is
Measured
What is the climate zone for this project?
4A Mixed Humid